Laserfiche WebLink
the approved reclamation plan (Tabs 19 to 22). The procedures outlined in the reclamation • <br />plan will result in prompt end effective revegetation which will minimize the emission of <br />dust on exposed surfaces due to wind erosion. Revegetated areas will be maintained by <br />restricting alL but essential vehituler traffic to light use, access, and haul roads. <br />The above control measures address the significant sources of fugitive dust at the Yoest <br />Nine site, end will effectively reduce the dust emissions to minimal rates. As a result, <br />the emission of fugitive dust will not present a signif ieant impact on the ambient air <br />quality in the near vicinity of the mine site. <br />• <br />i <br />2 <br />