Laserfiche WebLink
n <br />U <br />• <br />• <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Date of <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erosion forming gullies: <br />Ezcellen4 <br />Extensive, <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At [he principal spillway inlet? <br />DES No. (9O <br />derate Few, <br />Some, ery Fe , <br />Yes <br />Yes <br />Poor <br />None <br />Na y <br />No c. <br />4. Erosion of the downstream toe of the embankment? Yes No ~- <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No ~~ <br />Could this seepage cause potential instability? Yes No <br />E.eplain: <br />PRINCIPAL SPILLWAY <br />1. is the principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />Yes !i No <br />Yes !~ No <br />Yes /~ No <br />4. Is erosion occurring at the discharge outlet? Yes No_~ <br />Evaluate the severity: Extensive Ivfoderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes ~ No <br />2. Does it appear as if the emergenry spillway has discharged water since the last inspection? <br />Yes No `~ <br />3. Is erosion occurring at any section of the emergency spillway? Yes No // <br />Describe the ectent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservo1,•r been surpassed? Yes No / <br />If yes. explain: DRJD :S Gr Ut~1 f-~r ,;.~ L.itc (' is N,o~% inn <br />Please add any special comments cooceming potentially dangerous problems oo the back of tbis <br />sheet! <br />Inspected by: <br />