My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23041
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:43 PM
Creation date
11/20/2007 3:28:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/24/2001
Doc Name
1st & 2nd Qtr 2001 INSPECTIONS & 2001 ANNUAL CERTIFICATION
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~ <br />LI <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond ~t~kewe~'~ ~cvrJ.I7 NPDESNo. /Uh-~ <br />Date of Inspection ,1~e~vc-u ~-a- ~; ZUC ~ ` <br />1. Adeqttacy of the vegetative cover: Excellent, Moderate, ew, Poor <br /> <br />2. <br />Erosion forming gullies: Extensive, <br />Some, ~~ <br />ery Few, <br />None <br />3. Is wave action causing erasion: <br /> On the upstream embankment? Yes No /i <br /> At the principal spillway inlet'? r~- sp ~ ~ ~ `"~ t~ Yes No <br /> <br />4. Erosion of the downstream toe of the embankment? Yes No !/ <br /> The cause of the erosion is attributed to: <br />EMBANKMENT <br />5. Is seepage occurring through the dam? Yes No </ <br />Could this seepage cause potential instabilin~? Yes No <br />E.~tplain: <br />• PRINCIPAL SPILLWAY /~Jc 5~,, ) j ~d;c f, <br />1. Is [he principal spillway system in working order? J Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the dischazge outlet free of restrictive material? Yes No <br />4. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate the severity: E~Tensive Moderate Just Stoning None <br />EMERGENCY SPILLWAY /~~ ~~~nz~', jz<<<~ 5/~'+ ~~"~`~ <br />1. Is the overall emergency spillway system capable of passtng design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosion occurring at any section of the emergenry spilhvay? Yes No <br />Describe the extent: <br />• <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design siorage capacity of the reservoir been surpassed? Yes <br />~" <br />Please add any special comments cooceming potentially dangerous problems on the back of this <br />sheet! ~/ ~/ <br />Inspected by: /~ ~/ ,~'y-UC-ri <br />
The URL can be used to link to this page
Your browser does not support the video tag.