My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23023
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:43 PM
Creation date
11/20/2007 3:27:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Hydrology
Doc Date
4/22/1991
Doc Name
RATIONALE FOR PUBLIC NOTICE
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF HEALTH, Water Quality Control Division <br />Rationale - Page 3. Permit No. CO-0040827. . <br />IV. FACILITY DESCRIPTION <br />B. Wastewater Treatment Description <br />The previous permit listed seven discharge points Eor the facility, <br />001, 002, 003, 004, 005, 007 and 008. However, only 001 and 002 are <br />in existence. Treatment is provided at 001 by a sediment trap. <br />(Discharge point 006 will be for sewage treatment. The permit will he <br />amended to include this point when the treatment system is in place.) <br />Even though they are not yet constructed, the permittee wishes to <br />maintain discharge points 003, 004, 005, 007 and 008 in the permit, <br />since coverage under a discharge permit is required by Mined Land <br />Reclamation under their permit. <br />Discharge point 002 is for mine water, which has not been found yet. <br />Under normal circumstances, any water generated will be used within <br />the mine area for dust suppression or machinery cooling. Discharge <br />would only occur if a large volume of water were encountered. The <br />discharge points as proposed and existing are listed below: <br />Table IV-1 -- Discharge Points <br />D. Pt <br />Wastewater Source <br />Treatment <br />Design Capacity <br />001 <br />002 <br />003 <br />004 <br />005 <br />007 <br />008 <br />Stormwater runoff <br />Mine dewatering <br />Stormwater runoff <br />Stormwater runoff <br />Stormwater runoff <br />Stormwater runoff <br />Stormwater runoff <br />Sediment trap <br />(existing) <br />Sedimeat pond <br />(proposed - will <br />None <br />Sediment pond <br />Sediment pond <br />Sediment pond <br />Sediment pond <br />Sediment pond <br />0.0 31 <br />0.146 <br />replace sedimenC trap) <br />0.5 <br />0.082 <br />1.79 <br />0.098 <br />1.26 <br />0.101 <br />Pursuant to the authority of Article 9, Title 25, Regulations for the <br />Certification of Water Treatment Plant and Wastewater Treatment Plant <br />Operators, this facility may require a certified operator. <br />V. PERFORMANCE HISTORY <br />A. Monitoring Data <br />1. Discharge Monitoring Reports: This facility has not discharged <br />during the life of t e previous permit. <br />2. State Sampling: There are no state sampling results available Eor <br />this facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.