Laserfiche WebLink
Mine Area Seneca II <br />Project <br />Task <br />WORKSHEET N0. DEMO-1 <br />Material Labor EQU1D Sub Total <br />Totals Before Markups 73499 175038 111808 0 360345 <br />Sales Tax 0.00% 0 <br />Material Mark-up 0.00% 0 <br />Labor Mark-up O.OOX 0 <br />Equipment Mark-up O.OOX 0 <br />Subcontractor Mark-up O.OOX _ 0 _ __ <br />73499 175038 111808 0 360345 <br />Total Before Contingency 360345 <br />Contingency O.OOX 0 <br />Bontl O.OOX 0 <br />Job Tatal: Contingency and Bond Included 5360345 <br />CC1 Mark-up 97.70% - 8288 <br />Per CDMC, User Entered CCI <br />Job Total: City Cost Index Mark-up Included 5352057 <br />Modular Office Trailer <br />Demolition and Disposal <br />Yolume - Office <br />24'x60'x11' = 15,840 cf x 5,17/cf = 52,693 <br />- Footings (demo) <br />42 ea a 8"x2G"x24" = 64 linear feet <br />B4 x 59.44/linear foot = E793 <br />- Footings (disposal on site) <br />42 x 2.67 cf = 112 cf = 4.2 cy <br />4.2 cy x 55.10/cy = 522.00 <br />Total Office Trailer Addition = f3,508- <br />TOTAL FALIL IT IES = f355,565 <br /> <br />• <br /> <br />Revised 09/09/94 <br />