Laserfiche WebLink
• YORKSHE ET N0. SE-t <br />Support Equipment and Labor <br />Equipment Time Operator Cost/Hr Total <br />Light Plant <br />Z o.LI ~~6~ <br />L ighi Plants (6)~ 500 hrs. f8.48 820.69 ea x 6 866,310 7t }R S•~' <br />or 5132.62 <br />S~U,4R <br />fDOZer work (rough grading) amounts to approximately 2,000 hours each. Therefore, <br />darkness is equal to 25 percent of that time, or 500 hours. <br /> <br /> <br />