My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52692
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:23 PM
Creation date
11/20/2007 3:25:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974004
IBM Index Class Name
Permit File
Doc Date
4/12/1971
Doc Name
APPLICATION FOR RENEWAL PERMIT TO ENGAGE IN NEW OPEN MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />"EXHIBIT D" <br />Estimated timetable of operations including number of acres to be <br />affected at any one time: <br />"Exhibit G" provides a map, which pertains to the reclamation <br />plan. Upon this map are designated four (4) parcels of land, <br />which outline the areas affected by the mining operation. <br />Parcel-1 will not be subjected to any open mining, bit will <br />be used continuously throughout the life of the mini:ig opera- <br />tion for processing, stockpile, office, scale, and s:zop facili- <br />ties. Upon completion of the minin operations in t:ie other <br />three parcels, is area wil be reclaime for build ~pg s, <br />The objective date for completion of the mining operation is <br />1.957_and completion of the reclamation by lam. App._oximately <br />22 acres is anticipated to be affected at any one time. <br />Parc~~~defines the area provided for in the existi;ig open <br />mining permit number 35, and is the area now being mined. It <br />is anticipated that the extraction of the rock from :his area <br />will be completed b Decem At this poin~ in time <br />t e highwa wi 1 have become the principal working :face for <br />the extraction of materials from Parcel-3. The high,uall will <br />-~ <br />have only been shaped, terraced and stabilized to the extent <br />nr sustaining the exrrarr,nn jyrnrPacPC ,n accoraance witn <br />roper mining proced>>rPS Also the shaping and grading of <br />the floor of the quarry in Parcel-2 will have been completed. <br />Although mining at anv given time is limited to areas of 4 <br />acres or less, the entir s in this arcel to some <br />degree cou e affected at any one time, until this da <br />
The URL can be used to link to this page
Your browser does not support the video tag.