My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52567
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:18 PM
Creation date
11/20/2007 3:22:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994080
IBM Index Class Name
Permit File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)DITIONAL INFOR.h1ATI0N REQUIRED FOR CERTAIN ZONING REQUESTS: <br />.l/Gas exploration wells-- <br />- Proposed access to nearest public road <br />- Location of all associated equipment (tank batteries, treaters, flow lines, etc.) <br />- height of vehicle, frequency of trips, and expected travel route <br />- Plan for drilling mud containment and disposal <br />- Plans for sound mitigation (muffler) if gas engine proposed on well <br />- Plans and cross-section of proposed berm around tanks and wells (including <br />compaction of berm) <br />- Identify any residences within 400 feet of the well head <br />- Proposed time schedule for completion of well <br />- Approval of irrigation company if any ditches are to be crossed with flow lines <br />or roads <br />- Proposed site reclamation plan after well is completed <br />- Details of any accessory uses or production enhancement techniques <br />Mining operation (includes sand and travel extraction, quarries, borrow material <br />areas, and all other mining activities) <br />- E:isting and proposed access to nearest public road <br />- Location and type of all eouipment and operations on site <br />- Type and weight of all trucks, frequency of trips to the site, and expected <br />travel route <br />- Impact of the trucks on existing traffic in the area (detailed traffic impact <br />study may be required) <br />- All application material submitted to the State Mined Land Reclamation Board, <br />including detailed mining and reclamation plans <br />-'Hours and days of operation <br />- Plan for disposal/storage of overburden, waste material, or rubble <br />- Frequency of blasting <br />Identify any residences within 1000 feet of the mine or excavation <br />- Proposed time schedule for mining and reclamation <br />- Plans for minimizing dust and noise pollution <br />- Details of any landscaping that is proposed <br />- Explanation of any associated processing that will occur (e..g. batch plants, <br />wastting, screening, etc.) <br />Kennels (includes breeding, training, or boarding) <br />- Existing and proposed access to nearest public road <br />- Hours and days of operation <br />- Narrative explaining proposed kennel operation <br />- Number and type of animals to be on the site <br />- Drawings of the proposed kennel facilities (side views and floor plan, proposed <br />construction material, fencing, etc.) <br />- Associated facilities or services on the site (e.g. grooming, vet service, etc.) <br />- Plans for minimizing potential noise pollution <br />- Details of landscaping or screening from adjacent properties <br />- Number of employees <br />- Identify any residences within 1000 feet of the kennel <br />- Plan for kennel maintenance, and disposal of animal wastes <br />- Expected traffic impact of the kennel (number and frequency of vehicles to <br />the site, impact on local existing traffic patterns, etc.) <br />- Type of existing/proposed water and sewer services <br />LCPZ-25a( 1/88) <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.