My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52560
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:18 PM
Creation date
11/20/2007 3:22:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047A
IBM Index Class Name
Permit File
Doc Date
8/15/2002
Section_Exhibit Name
Exhibit J Other Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 6 <br />• Permit Na, COC-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING P.EQUIREMENTS <br />1. Effluent Limitations (con[inucd) <br />d) Burden of Proof Requirement <br />The permittee has the burden of proof <br />total suspended solids (TSS), total i <br />limitations. Relief shall be granted <br />not be granted when the permittee has <br />The permittee should endeavor to meet <br />whenever possible. <br />when requesting relief from <br />:on and/or settleable solids <br />only when necessary and shall <br />control over the discharge. <br />the primary limitations <br />1) For rainfall, to waive TSS and total iron limitations, it is <br />necessary to prove that discharge occurred within 48 hours after <br />measurable precipitation has stopped. In addition, to waive <br />settleable solids limitations, it is necessary to prove Char <br />discharge occurred within 48 hours after precipitation greater <br />than the 10-year, 24-hour event has stopped. <br />2) For snowmelt, to waive TSS and total iron Limitations, it is <br />• necessary to prove that discharge occurred within 48 hours after <br />pond inflow has stopped. In addition, to waive settleable <br />solids limitations, it is necessary co prove chat discharge <br />occurred within 48 hcurs after pond inflow volume greater than <br />the ]0-year, 25-hour event has stopped. <br />The Division shall determine [he adequacy of proof. As part of <br />this determination, the Division shall evaluate whether the <br />permittee could have controlled the discharge in such a manner that <br />primary limitations could have been met. All manual dewatering <br />must meet TSS and total iron limitations. <br />2. Stormwater Management Plan <br />The permittee shall prepare and submit two copies of a Stormwater <br />Management Plan (SWMP) to the Water Quality Control Division. The <br />plan shall be submitted within sip months from the date that <br />certification under this permit was eranted to the facility. An <br />additional copy of the plan shall be submitted to <br />Colorado Department of Natural Resources <br />dined Land Reclamation Division - Coal dining Section <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />. The Division will review. and approve each plan. Upon approval, the <br />plan shall be incorporated into the permittee's certification by <br />reference. Failure to implement the approved plan as described shall <br />be a violation of the permit. The plan shall remain in effect as long <br />as the facility is regulated by a CD PS permit. <br />J-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.