My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52382
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:11 PM
Creation date
11/20/2007 3:18:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001002
IBM Index Class Name
Permit File
Doc Date
5/7/2001
Doc Name
WEIMER ONE GRAVEL FN M-2001-002 112C PERMIT APPLICATION SECOND ADEQUACY REVIEW FINANCIAL WARRANTY ES
From
DMG
To
WEST END GRAVEL CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # . 007 <br />Date : 05/03/2001 <br />User : RCO <br />Agency or organization name : DMG <br />Permit or other job action :New 112 Application <br />Task description :Dress topsoil on slopes <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1, 584 <br />State :Colorado <br />County :Montrose <br />Site ~ Weimer One Gravel <br />Basic machine : Cal D8R - 8SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : 3-shank upper <br /> Utilization <br />Ownership cosUhour : $49.50 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op. cosUhour : $0, 00 0 <br />Operator cosVhour : $27.99 NA <br />Total unit cosUhour : $143.48 Total fleet cosUhour <br />$143.48 <br />Swel I Loose <br />LCY Tactor : NA volume : 1,584 LCY <br />Source of estimated volume :3.49 ac x 3" depth (swelled vo/ per task 006) <br />Source of estimated swell factor : NA <br />I <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avl <br />Average push distance : 50 feet Material consistency : 1.20 (Cat <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gei <br /> Visibility: 1.00 (avc <br />Material consistency description : Job efficiency : 0.83 (l shift, <br />Loose stockpile Spoil pile : 0.60 ((nd- <br /> Push gradient : 1.00 (Cat <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat <br />Average site altitude : 5, 860 feet Material weight : 0.90 (Cat <br /> Blade type: 1.00 (S/St <br />Material weight : 2, 550 Ibs/LCY Net correction : 0 40 <br />Weight description . <br />Earth -Dry packed Adjusted unit production : 565.76 LCY/hr <br /> . Adtusted fleet production : 565.76 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.80 Hours <br />Unit cost : $0.254 /LCY Total job cost : $402 <br />PermiUjob# : M-2001-002 <br />Abbreviation ~. none <br />Filename : M002-007 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.