My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52382
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:11 PM
Creation date
11/20/2007 3:18:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001002
IBM Index Class Name
Permit File
Doc Date
5/7/2001
Doc Name
WEIMER ONE GRAVEL FN M-2001-002 112C PERMIT APPLICATION SECOND ADEQUACY REVIEW FINANCIAL WARRANTY ES
From
DMG
To
WEST END GRAVEL CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task #' 008 State : Colomtlo <br />Date' 05/032001 County :Montrose <br />User: RCO Site:We/met One Gravel <br />Permit or ether job action :New 712 Application <br />Task description ~ Haul topsoil (or placement on slopes <br />HOURLY EQUIPMENT COST <br /> <br />PermiVjob # : M-2001.001 <br />Abbreviation :none <br />Filename : M002-006 <br />Model :Car 633E Series 2 Shift bases : 1 per tlay <br /> <br />Cost Breakdown : Job u tilization % Horsepower : 490 <br />Ownership cosUhour: E79.57 NA <br />Operating cosVhour : E776. 75 100 Weight (UST) : 56.34 <br />Operator cosUhour : $28.18 NA Cost data source : (CRG) <br />Total unit cosOhour : $224.50 Total Oeel cosUhour : $224.50 <br /> <br />MATERIAL QUANTITIES I <br />Initial Swell Loose <br />volume: 1,408 CCY factor: 1.125 volume: 1,584 LCY <br />Source of quantity lake-o0 : 3.49 ac x 3'tlepfh <br />Source of estimated swell factor : Na <br /> <br />HOURLY PRODUCTION <br />Haulino Caoacily <br />Scraper Payload (weight) Basis : Scmper Bawl (volume) Basis' <br />Material weight: 2,550 poundslLCY Struck volume: 23.20 LCY <br />Material description: Heaped volume: 34.00 LCY <br />Earth - Dry packetl Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 32.16 LCY Adjusted capacity ; 28.50 LCY ••• <br />Cvcle Time (load + haul + spread + relurnl' Loeding time ; 0.90 minutes • <br />Maneuver and spreading time : 0.70 minutes <br />Travel lime : 'loading bme per pair On push-pull models <br />Route I Distance lfeetl Grade r%1 Roll res.r%1 Total res.f%1 Velocih ffoml I Travel lime (min 1 <br />Return :I 500 0.0 5.0 5.0 2,124 0.46 minutes " <br />" Vavel ume adlusted for acceleuhpn and deceleration al load and dump points <br /> Total cycle lime 2.8J minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,860 Adiusled Hourlv Production <br />Altitude ad'justmenl factor : 0.96 (Cat HB) <br />Job efficiency lector : O.H3 f1 shiNtlayJ Unadjusted unit production : 653.16 LCY/Hour"' <br /> Adjusted unit production : 520.44 LCY/Hour <br />Net joh correction lector : O.BO Adjusted fleet production : 520.44 LCYMour <br /> "2 times wlume on push-pull models <br />I <br />JOB TIME ANO COST <br />Fleet size : 1 Scraper(s) Total job time : 3.04 Hours <br />Unit cost : E0.431 /LCY Total job cost : $683 <br />
The URL can be used to link to this page
Your browser does not support the video tag.