Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado PermiUjob# : M-2001-002 <br />Date: 05/03/2001 County: Montrose Abbreviation . none <br />User ~ RCO Sife :Weimer One Grave/ Filename : M002-003 <br />Agency or organization name .OMG <br />Permit or other job action :New 112 Application <br />Task description :Reduce interior highwall -cut and fill <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 . ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br /> Operating cosUhour . $65.98 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosVhour : $143.48 Total fleet cosUhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 619 BCY factor : 1.330 volume : 823 LCY <br />Source of estimated volume :Reclamation plan, initial <br />Source of estimated swell factor : n/a <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCYfhr Dozing method : 1.00 (gen.} <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/da} <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.52 (Cat HB) <br />Average push gradient : 25.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5, 860 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 900 IbslLCY Net correction : 0.54 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 754.66 LCY/hr <br /> Adjusted fleet production : 754.66 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time . 1.09 Hours <br />Unit cost ~ $0.190 /LCY Total job cost : $157 <br />