Laserfiche WebLink
<br /> CIRCES Cast Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado Permit/job# : M-2001-002 <br />Date 05(03/2001 County :Montrose Abbreviation . none <br />User . RCO Site :Weimer One Gravel Filename : M002-002 <br />Agency or organization name : DMG <br />Permit or other job action :New 112 Application <br />Task description :Dress backfilled slope surfaces <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank upper <br /> Data source ~ (CRGJ <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.50 NA <br /> Operating cosVhour : $65.98 100 <br /> Rlpperop.cosUhour : $0.00 0 <br /> Operator cosVhour : $27.99 NA <br /> Total unit cosUhour : $143.48 Total fleet cosUhour: $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,815 LCY factor : NA volume: 2,815 LCY <br />Source of estimated volume :3.49 ac surface x 6 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Parf/v consolidated stockpi/e <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description . <br />Earth -Dry packed <br />25.00 % Q <br />5, 860 feet <br />2, 550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />.80.492 /LCY <br />Job Condition Correction Factors <br />Operator skill ~. <br />Material consistency :_ <br />Dozing method :_ <br />Visibility : _ <br />Job efficiency :_ <br />Spoil pile :_ <br />Push gradient <br />Altitude :_ <br />Material weight :_ <br />Blade type :_ <br />Net correction <br />0.75 <br />1.10 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.42 <br />1.00 <br />0.90 <br />1.00 <br />0.21 <br />Source <br />HB) <br />(Cal HB) <br />(S/SU/UJ <br />Adjusted unit production : 291.69 LCY/hr <br />Adjusted fleet productlon : <br />( 291.69 LCY/hr <br />time : <br />Total job 9.65 Hours <br />Total job cost . $1,385 <br />