Laserfiche WebLink
The following is response to your December 6, 20051etter concerning water usage: <br />At the time the original permit application was submitted, a comrr-ercial well <br />conversion permit had not been issued by the state. An amount of 10 AF/ Yr was <br />requested. When the permit was issued, however, the state resMcted the amount to 7 <br />AF/ Yr at a flow rate of 15 GPM. Even at this reduced amount, there exists ample <br />water to control process dust and fugitive mine site emissions. <br />The anticipated need of 1.5 to 4 million gallons of irrigation water for reclamation is <br />substantially less than the amount of water resource available to the operator. From <br />the Dashner Ditch alone, at 2 cfs throughout the irrigation season, an amount in <br />excess of 800 GPM is available for reclamation purposes. <br />Please call me with any questions or comments you may have. <br />Sincere,~y, <br />.~~ <br />Matt Carnahan <br />Gravel, LLC <br />xc, w/attachments: Doug Simonson <br />