My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52282
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:07 PM
Creation date
11/20/2007 3:17:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
7/3/2007
Doc Name
03/29/2007 Stability Evaluation of Proposed Coal Wastepile No. 3 Report, Buckhorn Geotech
Section_Exhibit Name
Volume XI Coal Mine Waste Disposal Area No. 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 9. Summary of Stability Evaluations <br /> Maximum Critical Factor of Safety` <br />Cross Gob Gob Height' Total Stress Effective Stress <br />Sectionf Geometry= (ft) Analysis Analysis <br /> 1.68 (circular) <br />2.5H:1 V (0-95') 95 1.68 (high gw) 1.53 <br /> 1.53 (block) <br />2.5H:1 V (0-100') 100 1.58 (circular) 1 52 <br /> 1.46 (block) <br />2.SH:1V (0-50') 1.64 (circular) <br />3H:1V (50-105') 105 1.64 (high gw) 1.52 <br /> 1.52 (block) <br />Section A <br />2.SH:1 V (0-50') 110 1.57 (circular) 1.53 <br />3H:1 V (50-110') 1.44 (block) <br />2.SH:1V (0-50') 1.70 (circular) <br />3.SH:1V (50-110') 110 1.70 (high gw) 1.52 <br /> 1.54 (block) <br /> 1.59 (circular) <br />3H:iV (0-115') 115 1.59 (high gw) 1.81 <br /> 1.56 (block} <br />2.SH:1V (0-67') 95 1.98 (circular) 1 52 <br /> 2.05 (block) <br />2.SH:1V (0-50') 105 1.95 (circular) 1 76 <br />• <br />3H:1 V (50-77') 2.05 (block) <br />Section B <br />2.SH:1V (0-50') <br />110 2.14 (circular) <br />1.70 <br />3.SH:1V (50-77') 2.12 (block) <br />3H:1V (0-115') 115 1.82 (circular) 1 82 <br /> 1.81 (block) <br />2.5H:1V (0-93') 95 1.77 (circular) 1 52 <br /> 1.64 (block) <br />2.SH:1V (0-50') 105 1.91 (circular) 1 51 <br />3H:1 V (50-93') 1.79 (block) <br />Section C <br />2.SH:1V (0-50') <br />110 2.09 (circular) <br />1.52 <br />3.5H:1V (50-86') 1.91 (block) <br />3H:1V (0-115') 115 2.16 (circular) 1 82 <br /> 2.17 (block) <br />Notes: <br />1. Cross secton locations indicated on Drawing 2. <br />2. Indicates gob slopes for various heights. Height measured from downgradient toe of gob pile to crest or gob pile <br />for each particular section, as indicated in Appentlix E. A 15-foot wide bench 50 vertical feet from the tce rs <br />included in all analyses. <br />3. Maximum gob height measured from downgradient toe to crest of pile at maximum section (Section A). <br />4. Factor of safety by Spencefs procedure. <br />t <br />Bowie Gob Pile No. 3 stability report <br />Project N06~481-002 <br />Page 14 of t7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.