Laserfiche WebLink
• 3. Total inplace reserves for the E, lJild and D seams shown <br />in page 2.04-18 do not agree due to the omission of the <br />U.S. Steel lJest Lease reserves which are fee leases from <br />U.S. Steel and are not government reserves. Adding the <br />U.S. Steel West Lease to the WSC leases, the total inplace <br />reserves for the E Seam becomes 14.4 million tons. This cor- <br />rection has been made. On page 2.05-3 total production <br />estimated from recoverable reserves in the E seam and lower <br />seams is 9.6 million tons and 36.6 million tons respectively. <br />The 36.6 million tons includes reserves located in the <br />l•Jild Seam, D Seam, C Seam and B Seam, whereas information <br />included on 2.04-18 only includes the E, 41i1d and D Seams. <br />E Seam reserves are calculated at .667 recoverable. lJild <br />and D Seam reserves are arbitrarily granted a recovery rate <br />of .5 simply for lack of any useful experience in the vicinity. <br />4. Both the narrative and the map have been revised to reflect <br />the present mining plan (Exhibit 2.05.2-A, P.2.04-18, p. 2.05-18). <br /> <br />