Laserfiche WebLink
<br />EX E E Continued <br />]98~ <br />Mine Planner, INCO Metals -Copper CltfiSouth Mine, Copper Cliff, Onr. Canada <br />Responsible far mine-planning «•ork and methods development. <br />1975-76 <br />Driller, liYCO Nletats -- Frood Minr, Sudbury, Ont. Canada <br />Opera[ed various trend held and automated drilling equipment and perfomted blasting work in various <br />mining and dCVr)UpmCnr VperAllOnS. <br />PROJECT CONSULTING EXPERIENCE-_ <br />Bath Iron Works Land Level Transfer Faciliq• Prolecr - 2000, Bath ME. Atkinson Construction <br />Company. Developed controlo designed to protect endounered Short No~cd Eturgcon font the cffccte of <br />underwater blasting end to win regulatory pcrrnitting approvals. <br />Allied Pipeline Protect-2000. Mankato, MN. Welded Construction Co. and Universal Ensco. Investigated <br />potential vibration effects on nearby buried gas pipeline end developed blasting recommendations that <br />allowed the work ro proceed without incident. <br />San Roque Nlulti-use Dam Project (Philippines)- 2000. Evaluated extremely challenging geological <br />cuuditiuua and (JevolupcJ wunulfeJ ~lastiu= methods [o re(luce ovet(',~eak in power plant end dvn-spillway <br />excavations. <br />Cougar Lake Diversion Tunnel Upgrades Project - 1999. Defined controlled blasting methods and wrote <br />specifications for development of a gate-eftamber excavation and lake-tap bla-ct designed to facilitate <br />cotttroJled tvater.temparaturc reieacec from the trpCirPam rrcrrvnir rn the Mnti emir river. This fitas[- <br />englneerin~ work was performed for the Portland District of the US Army Corps of Engineers, undo the <br />coordination of INCA Engineers, lttc. <br />Lake Mead Intake Intake Na. 2 Project -1998-99. Designed air-curtain for aucnuetion of peak water <br />overpressure Senerated by a large underwater ditch blast, developed controlled blasting methods for rock <br />excavation work near new concrete repairs, and developed exbemely controlled blasting methods for a <br />series of elbow connection blasts desi~med to compiece a lake-tap connection between a drilled shaft and a <br />tunnel. Th.^se design services •vere done for the project oontractor-Lake Mead Constructors, Inc--n <br />consortium of Kietvit Companies. <br />TransColorado Pipeline Project - 1998. Due to concerns about blast effects on springs supplying water to <br />reservoirs for the cities of Palisade and Grand Junction, Colorado, rock blasting was prohibited for the <br />excavatinna In a nine-m11e section of the pipe trench an the Grand Mesa. While excavatlnRthe trench in ilia <br />na-blast zone, U. S. Pipeline, lrtc., the contrnutor on Spread No. 2 of this project, encountered many large <br />basalt boulders that could not he removed tvttlt conventional excavating equipment. GEOTEK investigated <br />poundal blast-Induced vibration efTer;ts tin nearby water resources and the reek end ground alopea that <br />housed them. After reviewing specific blasting controls and ground monitoring methods, recommended by <br />GEOTEK, Hydrogeologists representing the area water resources, allowed blasting to occur. All blasting in <br />the area of concern was completed without incident. <br />Chief Logan Dam Projec[ - 1997-98. Investigated and reported nn blacrino Aamnge rn mck In the dam's <br />abutment and spillway. Claims resulted when it was Icamed that this earth and rock filled dam would not <br />hold water, This review w•as coordinated by Woodward Clyde Associates (now URS Corp.), on behalf of <br />USt"KU--the prOJect surety. <br />Gordon F. Revey- ~uelifieations Page 2 Phone: (3D3) 470-0416 Fa%: (303) 791-0140 <br />