Laserfiche WebLink
Ol•7ERLY POND INSPECTION REF•T <br />PAGE 2 OF 3 <br />~pERATOR: SNOWMASS CDAL CO. <br />~1NE: N0. 1 8 N0. 3 MINES <br />•:~ND IDENTIFICATION P-b <br />'r PE OF POND DETENTION <br />TATUS DURING INSPECTION: <br />..:PROXIMATE WATER LEVEL 6-9" <br />_gQ (~ total storage) OK <br />;~TFLOW (cfs} NONE QUARTER: <br />DATE OF INSPECTION: <br />P-7 ~ P-8 <br />DETENTION DETENTION <br /> <br />b-9" 6-9" <br />OK OK <br />NONE NONE FIRST QUARTER 1989 <br />MARCH 21, 1989 <br />P-9 REFUSE <br />SEDIMENT SEDIMENT <br /> <br />36" 3-6" <br />OK OK <br />NONE NONE <br />~TURES PROBLEM COMMENTS <br />ZTSIONAL: YES NO <br /> <br />..ls ~ Gullevs X <br />_~adequate Vegetation X <br />t=let Channel Erosion X <br />irrows X <br />~~ r X <br />r..TURAL <br />_~-erential Settling X <br />,-wks or Slides X <br />~czge X <br />„^.-r X <br />~-~NANT STRUCTURES: <br />~g wtive Spillways X <br />-~=er Device Clogged X <br />~..Y Gates, Etc. X <br />_~°' X <br />-ONAL COMMENTS: P-9 HAS WATER STANDING IN IT WITHING 24" OF OVERFLOW. <br />a~vANCE REBUIRED: NONE <br />x ~ INSPECTOR: JIM STOVER <br />