Laserfiche WebLink
9U.CERLY POND INSPECTION REP <br /> III IIIIIIIIIIIIIIII PAGE 1 OF 3' <br /> 999 <br />OPERATOR: SNOWMASS COAL CO. QUARTER: FIRST QUARTER 1989 <br />MINE: ND_ 1 & N0. 3 MINES DATE OF INSPECTION: MARCH 21. 1989 <br />I <br />(POND IDENTIFICATION <br />P-1 <br />P-2 P-3 <br />P-4 <br />P-5 <br />TYPE OF POND DETENTION RECLAIMED SEDIMENT DETENTION DETENTION <br />STATUS DURING INSPECTION : <br />APPROXIMATE WATER LEVEL 6-9" 24" 6-9" 6-9" <br />SED (~ total storage) OK OK OK OK <br />OUTFLOW (cfis) NONE NONE NONE NONE <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />~ Rills & Gullevs X <br />Inadequate Vegetation X <br />~~ Outlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />Dififierential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Deflective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: P-3 HAS WATER STANDING IN IT WITHING 12" OF OVERFLOW. <br />MAINTENANCE REQUIRED: NONE <br />NAME OF INSPECTOR: JIM STOVER <br />