Laserfiche WebLink
III I IIIIIIII IIII III Doc Date:12/11/2001 <br />999 <br />SECTION 1.0 1993 Annual Reclamation Report <br />As specified by the revisions (1/3/90) to 2CCR 407-2, 2.04.13, page 74, Trapper Mine is submitting an <br />Annual Reclamation Report for the previous calendar year (1993). <br />Historically section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be sub- <br />mitted to the CDMG annually by March 15th. Prior to 1988 the map was entitled the "Postmine Contour <br />Map." As requested the title was changed in 1988 to "Reclamation Map." The reclamation map was <br />developed from aerial photographs taken during the previous fall showing the pit advancements, recon- <br />toured spoil areas for the year and an historical account of the previously regraded areas. <br />The 1993 reclamation map is a composite of the aerial photographs taken in October, 1993, and the recla- <br />mation performed during 1993 for all areas under bond. The map(s) (1.0) show the location and number <br />of acres for the acres disturbed, the acres backfilled and graded, the acres topsoiled and the acres revege- <br />tated during 1993. In addition, the location, number of acres and the planting dates for all previously <br />revegetated acres are provided. <br />1.1 Permittee Identification <br />The permittee for this annual reclamation report is: <br />Trapper Mining Inc. <br />P.O. Box 187 <br />Craig CO 81626 <br />Permit No. (C-81-010) <br />1.2 Results <br />The 1993 reclamation results are presented in Table 1.1 and map(s) 1.0. The various reclamation stages <br />are addressed below in separate subsections. <br />1.2.1 Disturbed Acres <br />In 1993, Trapper disturbed 343 acres resulting from topsoil salvage, haulage corridor construc- <br />tion, topsoil stockpile construction, sediment pond construction, and other miscellaneous activi- <br />ties as approved by the Division. <br />1.2.2 Backfilled and Graded Acres <br />Trapper backfilled and graded to final contour (AOQ approximately 264 acres in 1993. These <br />acres were in Browning, Colt and Derringer pits. <br />1.2.3 Topsoiled Acres <br />Trapper retopsoiled 274 acres during 1993 in Ashmore, Browning, Colt, and Derringer pits. <br />1.2.4 Species Planted <br />The species and seeding rates used at Trapper during 1993 were presented and approved in TR- <br />63 (7/15/93). The mixes were seeded as approved (Table 1.1). There were 331 acres revege- <br />toted to perennial species associated with mine pit(s) advancement. <br />