Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 6X5 <br />Date : 05/15/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Elk Creek Mine <br />PermiUjob# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-6X5 <br />Agency or organization name : Colomdo Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2006-223-07 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Roads <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership wst/hour : $56.94 NA <br /> Operating cosUhour : $104.98 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $194.45 Total fleet cosUhour : $194.45 <br /> .. 3 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,700 BCY factor : 1.250 volume : 2,125 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 ~ (1 <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.75 (avl <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 -' (gee <br />Visibility : 1.00 (av. <br />Job efficiency : 0.83 (lshift <br />Spoil pile : 0.80 (Ind <br />Push gradient: 0.90 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.90 (Cat <br />Blade type : 1.00 (S/SI <br />Net correction : 0.41 <br /> <br />Adjusted unit production : 369.40 LCYlhr <br />Adjusted fleet production : 369.40 LCY/hr <br />Total job time : 5.75 Hours <br />Unit wst : $0.526 /LCY Total job cost : $1,119 <br />