Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 6X4 <br />Date : 05/15/2006 <br />User : JRS <br />Permitlob# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-6X4 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2006-223-07 <br />Task description :Replace Topsoil from Stockpile to Drill Pads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />State :Colorado <br />County :Delta <br />Site :Elk Crsek Mine <br />Basic machine :CatD9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shin basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership cosUhour : $56.94 NA <br />Operating cosUhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosVhour : $194.45 Total fleet cosVhour <br />$194.45 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 800 BCY <br />Swell Loose <br />factor: 1.250 volume: 1,000 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION _. <br />Job Condition Correction Factors ;: <br />Source <br /> <br />Avera <br />e <br />h di <br />t Operator skill : 0.75 (avg.) <br />g <br />pus <br />s <br />ance : 100 feet Material consistenc <br />: 1 <br />00 <br /> <br />Unadjusted h <br />l <br />d y . (Cat HB) <br />our <br />y pro <br />uction : 1,243.2 LCY/hr Dozing method : 1.00 <br />(gen.) <br /> <br />Material consistency description : Visibility : 1.00 (avg.) <br /> <br />Consolidated stockpile Job efficiency : 0.83 (lshiff/day) <br /> Spoil pile : 0.80 (ind-r~ <br /> <br />Avera <br />e <br />h <br />di Push gradient : 0.90 (Cat HB) <br />g <br />pus <br />gra <br />ent : 5.00 % (pos) <br /> <br />Avera <br />it <br />l <br />i Altitude : 1.00 (Cat NB) <br />ge s <br />e a <br />t <br />tude : 7,000 feet Material weight : 0.90 (Cat HB) <br /> <br />M <br />t <br />i <br />l <br />i Blade type : 1.00 (S/SU/U) <br />a <br />er <br />a <br />we <br />ght : 2,550 Ibs/LCY Net correction : 0 <br />41 <br />Weight description . <br />Earth -Dry packed Adjusted unit production : 504 <br />38 L <br /> . CY/hr <br /> Adjusted fleet production : 504.38 LCY/hr <br />;z: <br /> <br />JOB TIME AND COST :; <br />,.. <br />~~ <br />,. :; <br />~ ~~ " ~~~ <br />Fleet size : 1 Dozers) Total job time : 1.9B Hours <br />Unit cast : $0.386 /LCY Total job cost : $386 <br />Data source : (CRG) <br />