Laserfiche WebLink
~. <br />QUARTERLY POND INSPECTION REPORT <br /> PAGE 2 OF 2 <br />OPERATOR: MINREC, INC. QUARTER: THIRD QUARTER 1994 <br />MINES: NORTH THOMPSON CREEK DATE OF INSPECTION: SEPTEMBER 19, 1994 <br />POND IDENTIFICATION LONG POND T-1 T-2 <br />TYPE OF POND TREATMENT TREATMENT TREATMENT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL FULL FULL FULL <br />SED ($ total storage) N/A N/A N/A <br />OUTFLOW (gpm) TO T-1 TO T-2 +/- 25 <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X Long Pond Was Seeded In.Fall 1993 <br />Outlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater.Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: A small seep surfaced near the east end of the long <br />pond. This seepp is not a <br />i concern regarding the integrity of the pond. <br />D <br />scharge from T-2 is bei ng diverted to the collection ditch leading <br />to the Refuse Pile Pond. <br />MAINTENANCE REQUIRED: None ~ <4 <br />"~ <br />~ <br />NAME OF INSPECTOR: Jim Stover, P.E. 19230 -~o <br />,'S <br />