Laserfiche WebLink
<br />i <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2005 Monthly Report <br />Page 3 <br />Table 2 -May 2005 Tailing Disposal Area Piewmeter Depth to Water <br />Measurements <br />Piewmeter Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 S/31/05 72.46 0.00 <br />P7 5/31/OS 92.31 92.50 0.19 <br />P8 S/31/OS 96.71 97.51 0.80 <br />P9 S/31/05 71.77 72.30 0.53 <br />Pt0 5/31/OS 57.36 58.30 0.94 <br />Pll 5/31/05 41.30 41.80 0.50 <br />P12 5/31/05 41.57 41.71 0.14 <br />P13 5/31/OS 40.94 41.34 0,40 <br />P14 5/31/05 41.24 0.00 <br />P1S 5/31/OS 41.10 0.00 <br />Water Treatment Plant Sludge Management Year to Date <br />DATE QUANTITY MANAGEMENT <br />MARCH 2005 392.5 TONS Sludge transferred from drying pad to tailings <br />impoundment. <br />MAY 2005 Sludge pumped from Pond #3 to drying pad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bil~Lyle (303) 324-2630 or (970) 325-4482. <br />Coordinator III <br />Cc: $ill Lyle <br />file <br />