My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22650
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:41 PM
Creation date
11/20/2007 3:10:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
6/9/2005
Doc Name
monthly report
From
battle mountain resources
To
dmg
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />Ir <br />June 09, 2005 ,/ <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~~~~/ V~~ <br />JAN ~ 3 ?~ <br />Oivisian of rylinorols and OeologY <br />Re: Battle Mountain sources Inc. <br />San Luis Project t/ <br />CMLRB Permit No. M-88-1121i' <br />May 2005 Monthly Report <br />Deaz Mc Waldron: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of May 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing lysimeters was verified on May 31", no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />May 31", the West Pit and tailings embankment monitoring wells were collected on May 31". <br />May 31" tailing impoundment piezometer measurements identified these installations were either <br />dry or contained less than 12 inches of water as illustrated in Table 2. Tables l and 2 below <br />identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdmin flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on May <br />31~`. The May tailings pond underdrain flow average was 34.89 gpm and a total of 680 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 20 gpad. <br />During May, the West Pit water treatment plant operated efficiently discharging a total of <br />10,577,400 gallons (32.46 acre-feet) of water to Rito Seco Creek and a total of 687,600 gallons <br />(2.11 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for May was .58" inches, with the largest accumulation occurring on <br />May 4's (.24"). <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.