My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22567
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:36 PM
Creation date
11/20/2007 3:06:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Hydrology
Doc Date
2/17/1997
Doc Name
CDOFPH&E SWMP ANNUAL REPORT C-81-041
From
POWDERHORN COAL CO
To
DMG
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I Page 5 of 20 <br />Permit No. COR-040000 <br />A. COVERAGE UNDER TffiS PERMIT (cont.) <br />5. Individual Permit Criteria <br />Aside from the operation type, the Division may use other criteria in evaluating whether an individual permit is <br />required instead of this general permit. This information may come from the application, SWMP, or additional <br />information az requested by the Division, and includes, but is not limited to, the following: <br />a. the quality of the receiving waters (i.e., the presence of downstream drinking water intakes or a high quality <br />fishery, or for preservation of high quality water); <br />b. the type of mining operation, including pollution potential; <br />c. the volume attd type of materials handled; <br />d. the size of the facility; <br />e. evidence of noncompliance under a previous permit for the operation; <br />f. the use of chemicals within the stormwater system. <br />In addition, an individual permit tray be required when the Division haz shown or has reazon to suspect that the <br />stormwa[er discharge is a significant contributor of pollutants to waters of the State. <br />6. Permit Exuiration Date <br />Authorization to tiischazge under this general permit shall expire on September 30, 2001. The Division must <br />evaluate and reissue this general permit once every five years and must recertify the applicant's authority to <br />discharge under die general permit at such time. Any permittee desiring continued authorization under the general <br />permit must reapply by June 30, 2001. The Division will determine if the applicant may continue to operate under <br />the terms of the general permit. An individual permit will be required for any facility not reauthorized to discharge <br />under the reissued general permit. <br />B. STORMWATER MANAGEMENT PLAN -ACTIVE MINES <br />A Stormwater Management Plan (SWMP) shall be developed for the portion of each facility covered by this permit. The <br />SWMP shall be prepared in accordance with good engineering practices. (The plan need not be completed by a <br />registered engineer.) The plan shall identify potential sources of pollution (including sediment) which may reasonably be <br />expected to affect the quality of stormwater discharges azsociated with the mining operation. In addition, the plan shall <br />describe and ensure the implementation of best management practices (BMPs) which will be rued to reduce the pollutants <br />in stormwater discharges azsociazed with mining activity and to assure compliance with the terms and conditions of this <br />permit. <br />Permittets must implement the provisions of their SWMP as a condition of this permit. The Division reserves the <br />right to review the plait, and to require additional meazures to prevent and control pollution az needed. <br />SWMPs which met criteria in the previous version of this permit are acceptable <br />The SWMP for active mines shall include the following items, at a minimum: <br />1. Description of N[inine Activities <br />The plan shall provide a narrative description of the mining and associated activities taking place at the site which <br />affect or tray affect stormwater runoff intended to be covered by this permit. The narrative description shall report <br />the total acreage within the mine site and an estimate of the number of acres of disturbed area. A general <br />description of the. location of the mining site relative to major transportation routes and communities shall also be <br />provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.