Laserfiche WebLink
<br />20) c. As discussed with you and Mr. Routten, new <br />disturbance area boundary markers will be installed when <br />ground conditions and establishment of the new vegetation <br />permit. These markers probably cannot be set until spring, <br />when the ground thaws out. <br />9)-10). Ditch dimensions. Please note Page 4-57, <br />Section 4.4.2.4, 4th paragraph (re-write dated 10-10-94) where <br />the ditch dmimensions for the individual ditches are <br />described, Those dimension correspond with the calculations <br />shown in Exhibit 4.7-1. As is a practice with newly <br />constructed ditches, especially an refilled areas, the final <br />dimensions will be established by regrading the ditches with <br />a dozer or tractor once the vegetation on both sides of the <br />ditches is established. This will be done in early spring, <br />when softer ground conditions, due to the moisture content, <br />allow such regrading. <br />11) a. through c. See the new exhibit prepared by Mr. <br />Ed Rovey, Professional Hydrologist. Mr. Rovey visited the <br />site and took all necessary measurements onsite. <br />Sincerely, <br />~/~/ i~% <br />E. Peter Matthies <br />i^~Y <br />0~+~~p„i~G~„)i <br />