My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51788
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:48 PM
Creation date
11/20/2007 3:04:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979075
IBM Index Class Name
Permit File
Doc Date
3/11/1980
Doc Name
ELAM CONSTRUCTION CHAMBERS PIT CONVERSION FN 79-75 HR
To
ELAM CONSTRUCTION INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii uiiiiiiniu iii • <br />999 <br />March 11, 1980 <br />Pfr. J. D. Kreissler <br />Elam Construction, Inc. <br />1125 S. 7th Street <br />Cra:id Junction, Colorado 01501 <br />Re: F.lam Construction t Chambers Pit, Conversion <br />Our File 79-75/NR <br />Dear F:r. Kreissler: <br />I lkave completed my adequacy review of your mining and reclamation permit <br />a1~plicaL-ion for the above captioned operation. I have several comments <br />and/or questions concerning the application which are presented on an <br />exhibit--by-exhibit basis below. Exhibits not mentioned are considered <br />adequate or await review by advisory agencies. <br />Application item 17 - Proposed Future Land Use: <br />A ire acceptable future land use for this site would be as wildlife <br />habitat. As such, this would be a beneficial ]Bnc~ use as required by <br />the fiined Land Reclamation Act (34-32-103(13]). <br />Exhibit C: <br />~1. fining stage 3 should be identified gore clearly. <br />2. It Ss not clear whether the existing access mad or the area narised <br />"leased accoss" is to be used as the access to the operation (see <br />comments, exhibit D). <br />3. Is the 100' undisturbed greenbelt included in the affecte:? land? <br />Exhibit D: <br />1. Stages 2 and 3 of the mining plan should be more carefully described <br />as to direction of mining (as is done for stage 1). <br />2. Topsoil from roads should be stripped, stockpiled and planted with <br />a nemnnial grass cover such as western wheatgrass (broadcast at 6.0 Ibs. <br />Wore live seed/acre). This will facilitate reclamation at the end <br />of the operation. <br />(cont'd) <br />
The URL can be used to link to this page
Your browser does not support the video tag.