My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51753
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980252
IBM Index Class Name
Permit File
Doc Date
3/25/1981
Doc Name
PARK CNTY GRAVEL PITS FN 77-365 80-9 THRU 80-19 INCLUSIVE 80-251 80-252
To
PARK CNTY ROAD AND BRIDGE DEPT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ iii iiiiiiiiiiiuiii <br /> <br />Pfarch 25, 1981 <br />Mr. Bob Freitag <br />Park County Road ~ Bridge Dept. <br />P. 0. Box 147 <br />Fairplay, Colorado 80440 <br />RES Park County Gravel Pits - Our File 077-365 <br />x180-9 thru <br />"80-19 inclusive., <br />?30-251 <br />,'~30-252 <br />Dear 1•tr. Freitag: <br />If you will agree to the following contingencies, I will recommend approval <br />of the above applications to the itined Land Reclamation Board `!,arch 31st. <br />Unless you respond to the contrary, it will be assumed that you are in <br />agreement. <br />1. Rule 6.4 states verq specifically that topsoil shall be <br />removed and stockpiled from other spoil prior to <br />extraction. <br />I would agree that it is not practical to stockpile topsoil <br />from the T~*!n (`rook Pit, and tha Soil Conservation Service <br />report suggests the voile at the Hall Gulch, Sportsmans <br />and Eikhorn Springs Pit are simi ar1~y eloped. <br />However, I have inspected several of the other pits and do <br />not agree that soil should not be salvaged from the future <br />workings. As an exasaple, Granite Construction Company. a <br />short distance to the NW of the 11-!file Pit, will be stripp- <br />ing 3-6 inches of topsoil for salvage. The topsoil does sot <br />have to have tha large cobbles separated from tha fines to <br />be useful. The Soil Conservation Service reports show <br />adequate topsoil development for the otlser sites which orar~ <br />warrant stripping. N' °~~ ~ <br />Therefore, we will require that when topsoil of 3 inches or <br />greater in thickness is encountered during expansion of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.