Laserfiche WebLink
., <br />PART I <br />Page No. 10 <br />Permit No. COG-850000 <br />EFFLUENT LIlt-II'fATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Management Plan (SWMPI (continued) <br />f) Emolovee Education <br />The permittce shall develop and implement employee educaion programs to inform personnel a[ all levels of <br />responsibility of the components and goals of the SWMP. Education should address topics such az spill response, <br />good housekeeping and material management practices. The permince shall iden[ify periodic dates for such <br />instmctioa. <br />3. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitazions specified in <br />Part I.B.1, the permittee shall monitor all effluent parameters at the following frequencies. <br />a) Active Miaine Outfalls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />TSS, mg/P Monthly Grab <br />Total Iron, mg/P Monthly Grab <br />Settleable Solids, ml/P Monthly Grab <br />Oil and Greax, mg/l Wcekly Visual <br />pH, s.u. Weekly In-situ <br />Total Dissolved Solids, mg/l Qtarterly Gtab <br />CO River Basin ONLY <br />Total Phosphorus (az P), mg/P Quarterly Grab <br />Dillon Reservoir gad T pper Beaz Cterk" <br />Drinages Only <br />b) Pon-Minine Outfalls <br />--- --.-. <br />Parameter- -. Measurement Frequency Sample Type <br />flow, MGD Monthly Instantaneous <br />or Continuous <br />SeNeable Solids, ml/P Momhly Grab <br />Oil and Grease, tng/P Monthly Visual <br />pH, s.u. Monthly In-sim <br />Total Dissolved Solids, mg/P Quarterly Grab <br />CO River Bazin ONLY <br />Total Phosphorus (az P), mg/P Quarterly Grab <br />Dillon Reservoir and Upper Bear Creek" <br />Drainages ONy <br />See Part I.C. for De<nitioas <br />