My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22508
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:33 PM
Creation date
11/20/2007 3:03:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Hydrology
Doc Date
5/27/1997
Doc Name
CERTIFICATION COLO WASTEWATER DISCHARGE PERMIT SYSTEM PN COG-850027 OAKRIDGE ENERGY LA PLATA CNTY
From
CODH
To
NOEL PAUTSKY
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 8 <br />Permit No. COG-850000 <br />EFFLUENT LIMITATIONS AND MONITORING REQUIItEMENTS <br />2. stormwater Manaeement Plan (SWMPI (continued) <br />3) Stormwazer Quality Controls <br />Each mining site covered by this permit shall develop a description of stormwater quality controls appropriate <br />for that site, and implement such controls. The appropriazeness and priorities of controls in the plan shall <br />reflect identified potential sources of pollutants az the site. the description of stormwater quality wntrols shall <br />address the following minimum wmponeass, including a schedule for implementing such conuols: <br />a. SWMP Administrator -The SWMP shall identify a specific individual or individuals within the mining <br />organiza[ion who is responsible for developing the SWMP and assisting the mine operator in iss <br />implem~~nr~on. maintenance. and revision. <br />b. Materials Handline and Spill Prevention -Where materials can impau stormwater runoff, BMPs thaz reduce <br />the potential for contamination shall be described. For example, materials should be stored and handled is <br />covered areas whenever possible [o prevent contact with stormwazer; fuels and other chemicals should be <br />stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater <br />runoff. <br />c. Erosion and Sediment Controls - Describe BMPs thaz willbe used to reduce erosion and prevent sediment <br />delivery to Staze wazers. These should include structural (such as silt fences, sediment ponds, drop <br />strucrures, check dams) and non-structural (such as mulching and revegetatioa) methods. <br />Whenever a facility or a portion of a facility enters the oust-rninine phase, it is likely that the overall <br />configuration of the site will change considerably. Prior to the time when new vegetation becomes <br />established, the surface aeeas will be subject to potentially significant erosion. 1'he permittee will need to <br />take adequate measures is order to ^~+~+,+,+~r this erosion az well as the erosion normally encountered <br />during mining activities. <br />d. Identification of Discharees other than Stormwazer -The stormwazer convryance system oa the site shall be <br />evaluazed for the presence of discharges other than stormwazer, such as mine drainage, spoil springs, <br />sanitary waste, or process water of any kind. The SWMP shall include a description of the results of any <br />evaluation for the presence of dischazges other than smrmwazer, the method used, the date of the <br />evaluation, and the on-site drainage points that were directly observed during the evaluation. <br />b) Facility Inspections <br />Qualified personnel identified by the operazor shall make a comprehensive inspection of their stormwater <br />managemept rystem, az least twice per year (in the spring and fall), except as provided in paragraphs d and e, <br />below. These comprehensive iaspeaions must be documwted and rnmmri~svi is tite Annual Repot (see Part <br />I.D.2. of the permit). <br />1) Material handling areas, disturbed areas, areas used for material storage thaz are exposed to precipitation, and <br />other potwtial sources of pollution identified in the SWMP in accordance with Part I.B:2.a)1) of this permit <br />shall be inspected for evidrnce of, or the potential for, pollutanu rntering the drainage system. Structural <br />stormwater management measures, sediment and control measures, and other structural pollution prevention <br />measures identified in the plan shall be observed to ensure that they aze operating correctly. A visual inspection <br />of equipment needed to implement the plan, such as spill response equipment, shall be made. <br />2) Bazed on the results of the inspection, the description of potential pollutant sources and pollution prevention <br />measures identified in the plan shall be revised as appropriate within two weeks of such inspec7ioa. Such <br />revisions shall provide for implementation of any changes to the plan in a timely mar,~K, but is no caze mote <br />than 90 days after the inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.