Mr. Robert Liddle -4- August 23, 1984 <br />to this proposal. It is anticipated that minor grading could be <br />necessary if, during the excavation phase, local areas below natural <br />grade are created. Blue Ribbon does not anticipate needing any <br />imported material to accomplish this grading. <br />9. Specifically address how riparian vegetation will be re-estab- <br />lished at this site, including species proposed and planting <br />methodology. <br />Blve Ribbon has recently been in contact with the Division for advice <br />in this area. On August 22nd four random meter square test areas were <br />established in areas representing typical vegetation near the stream. <br />The willow count in those four test areas is as follows: <br />Test Area 1 - 20 plants Test Area 2 - 31 plants <br />Test Area 3 - 21 plants Test Area 4 - 29 plants <br />During the first week of the reclamation project, the willows covering <br />Areas A and C' will be removed. Approximately 25% of those plants <br />will be trimmed to 12" to 18" in length and placed at the edge of <br />Pond IF1 to allow rooting. During the final phase of this reclamation <br />project, a portion of the willows will be replaced in Areas A and C' <br />by punching an approximate 1" hold in the ground, planting, and covering <br />the willow roots. Approximately one gallon of water for each plant <br />will be added during the planting process. Blue Ribbon commits to a <br />minimum vegetation success of 10% of the average willows per square <br />meter, or 2~ willows per square meter. If the first revegetation effort <br />does not meet the stated minimums, additional cuttings and transplanting <br />will be performed until the stated vegetation success minimum is met. <br />AREA B <br />We have mapped the coal deposits you describe as Area B with more <br />specificity. That area is now shown as two segments on the attached <br />map, Areas B and B'. Those areas will be hand picked to remove large <br />chunks of coal from the surface and along the stream bed. Blue Ribbon <br />will notify the Division of completion and seek approval for the <br />clean-up work done in Areas B and B' by November 1, 1984. <br />AREA C <br />Blue Ribbon has defined Area C as Areas C and C', with C' being <br />the portion needing equipment for excavation. The remainder of Area C <br />will be hand picked to remove the large chunks of coal from the surface <br />and along the stream bed. Blue Ribbon submits to the same November 1st <br />schedule for requesting Division approval of work done. <br />AREA D <br />Area D has been defined previously in this letter. This area, <br />like Area B, will be hand picked to remove large chunks of coal from <br />