Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : dz2 <br />Date : 1120/1003 <br />User : BHM <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : La Ptata <br />Site : Oakridge Energy <br />Agency or organization name : Lewicki And Assc. <br />Permit or other job action :Final Rec <br />Task description <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.81 NA <br /> Operating cost/hour : $76.74 80 <br /> Ripper op. cosUhour : $1.18 10 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cost/hour : $160.72 Total fleet cost/hour : $160.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,009 BCY factor : 1.250 volume : 35,011 LCY <br />Source of estimated volume :ACAD <br />Source of estimated swell factor :ACAD <br /> <br />HOURLY PRODUCTION ~ Job Condition Correction Factors Source <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient ~ 2d'Off~ % (1 <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Horsepower: 405 <br />Operator skill <br />Material consisiency <br />Dazing method <br />Vsibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />PermiUjob# :080 <br />Abbreviation :none <br />Filename :0080-dz2 <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.45 <br />1.00 <br />0.90 <br />1.00 <br />0.24 <br />