Laserfiche WebLink
TruckjLoaderTeamWorkcorrt'd Task#: trl <br />Loading Tool Cvcle Time :~ Number of loading tool passes required to fill truck :_ <br />FJrC3vators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value vAtirin basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA <br />Wheel and track loaders -unadjusted basic cyde time (load, maneuver, and dump ) <br />sheet 2 of 2 <br />3 ~ passes <br />Dump : 0.100 <br />0.550 minutes <br />Cyde Time Factors Loading Condition Description Factor (min.) Source <br />Matedal : No adjustment -factor not applicable 0.000 (Cat HB) <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat HB) <br />Truck ovmership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat H8) <br /> Net cyde time adjustment : 0.000 minutes <br /> Adjusted basic cycle time : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 1.200 minutes <br />Tmck Cvcle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.200 minutes........ Adjusted for she altitude : 1.20 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.90 minutes <br />Truck travel (haul & return) time: <br />Road condition descdpton : Soft rutted dirt, no maintenance or water, 4'tire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Tota4 <br />resistance (%) Speed <br />feef/minute Travel time' <br />(minutes) <br />1 260 0.00 5.00 5.00 1695 0.23 <br />2 1,440 11.50 3.00 14.50 616 2.34 <br />3 550 0.00 8.00 8.00 1177 0.53 <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul time " : 1.10 minutes <br />1 550 0.00 8.00 8.00 2274 0.33 <br />2 1,440 -11.50 3.00 -8.50 3520 0.41 <br />3 260 0.00 5.00 5.00 3200 0.16 <br /> <br /> <br /> <br /> <br /> <br />' first and last segmeNS atlJusmd kr accaleratioNtleceleratian Return time " : 0.90 minutes <br />"6me shown inc7uEn ektuda adlusbnaN Total truck cycle time : 8.80 minutes <br />Loading tool unit production : 563.16 LCYRtour...... Adjusted forjob effidency : 467.42 LCYmour <br />Tmck unit production : 145.08 LCYRtour...... Adjusted forjob efficiency : 120.42 LCYRrour <br />Optimal no. trucksAoading tool : 4 trucks........... Seleded no. trucksAoader : 4 trucks <br /> Adjusted hourry truck team production : 481.66 LCYflrr <br /> Adjusted howdy single trucklloader team production : 467.42 LCYltrr <br /> Adjusted howdy multiple trucklloader team production : 467.42 LCY/hr <br />JOB TIME AND COST ;, ~ ,. ~. -:...•.'. ...;.: ' , :: .:;:: .. ~,.~< <br />Fleet size : 1 Team(s) Total jab time : 74.90 Hours <br />UnR cost : $1.068 /L.CY Total job cost : $37,328 ~~ <br /> <br />