My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />BULLDOZER WORK <br />Task # : du <br />Daie : 11252003 <br />User : BHM <br />State :Colorado <br />County : La Plata <br />Site : Oakridge Energy <br />PertniUjob# :080 <br />Abbreviation :none <br />Filename :0080-dzz <br />Agency or organization name : L And Assc. <br />Permit or other job action : Fina! Rec <br />Task description :Task 37 <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $46.75 NA <br /> Operatingcost/hour : $76.74 80 <br /> Ripper op. cosf/hour : $0.00 NA <br /> Operator cosUhour : $27.99 NA <br /> Total unit cost hour : $151.48 Total fleet cosUhour : $151.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 39,930 BCY factor : 1.250 volume: 49,912 LCY <br /> <br />Source of estimated volume :ACAD <br />Source of estimated swell factor :ACAD <br /> <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Compacted fill orembankment <br />Average push gradient : 15.00 % (i <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv hacked <br />Operator skill <br />Material censisiency <br />Dozing method <br />visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net cortection <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.537 /LCY <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.60 <br />1.33 <br />1.00 <br />0.90 <br />1.00 <br />0.40 <br />281.97 LCY/hr <br />281.97 LCY/hr <br />Total job time : 177.01 Hours <br />Total job cost : $26,815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.