My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : dzz <br />Date : 11252003 <br />User : BHM <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : La Plata <br />Site :Oakridge Energy <br />Permit/job# :080 <br />Abbreviation :none <br />Filename :0080-dzz <br />Agency or organization name : L And Assc <br />Permit or other job action :Final Rec <br />Task description :Task 35 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 10,000 <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Utilization <br />Ownership cosUhour : $46.75 NA <br />OperatingcosUhour : $76.74 BO <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $151.48 Total fleet cosUhour <br /> <br />Swell Loose <br />BCY factor : 1.250 volume : 12,500 <br />Source of estimated volume :ACRD <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Con-ecion Factors <br />Average push distance : 450 feet <br />Unadjusted hourly production : 266.7 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 28.00 % (~ <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.896 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility: f.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.57 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.63 <br />Adjusted unit production <br />Adjusted fleet production <br />$151.48 <br />LCY <br />Source <br />169.03 LCY/hr <br />189.03 LCYlhr <br />Total job time : 73.95 Hours <br />Total job cost : $11,202 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.