Laserfiche WebLink
Truck/Loader Team Work cortt'd Task # : h4 sheet 2 of 2 <br />Loading Tool Cvcle Time : ~~ Number of loading tool passes required to fill truck : 3 passes <br />Excavators and from shovels -machine cyGe time vs. job condition refing : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condifion Description Factor (min.) Source <br />Material: Noadjustment-factor not applicable 0.000 (CatHB) <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat H8) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : No adjustment -factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : 0.000 minutes <br />Adjusted basic cycle time : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed dudng truck exchange) : 1.200 minutes <br />Truck Cvcle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: J.200 minutes........ Adjusted for site altrlude : 1.20 minutes <br />Truck maneuver and dump time: 1.00 minutes........ Adjusted for site alttude : 1.00 minutes <br />Truck travel (haul & return) time: <br />Road condition descdption :Finn, smooth, rolling, dirt or light surfaced, watered, maimainec <br />Haul route <br />Road <br />seg. 0 Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (°h) Topl <br />resistance (%) Speed <br />feeUminute Travel time' <br />(minutes) <br />1 540 3.30 5.00 8.30 1177 0.52 <br />2 800 11.50 3.00 14.50 616 1.32 <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul lime": 1.84 minutes <br />> 800 -11.50 3.00 -8.50 3520 0.33 <br />2 540 -3.30 5.00 1.70 3360 0.26 <br /> <br /> <br /> <br /> <br /> <br /> <br />'first arM last sepmaMS aEjusteE for aaelemtioNdec°larsti°n Return time": 0.59 minutes <br />°emo slwvm induees emewo.eiusm,art Total truck cycle time: 5.13 minutes <br />Loading tool unk produclion : 563.16 LCYlhour...... Adjusted for job efficiency : 467.42 LCYlhour <br />Tmck unit production : 186.64 LCY/hour...... Adjusted for job efficency : 154.91 LCYlltour <br />Optimal no. truckslloading tool : 3 trucks........... Selected no. Wckslloader : 2 trucks <br />Adjusted hourly truck team production : 309.82 LCYIIx <br />Adjusted houdy single truck/loader team production : 308.82 LCYIty <br />Adjusted hourly mulfiple trucklloader team production : 309.82 LCYOrr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 1 ours <br />Unit cost: $1.917 /LCY Total job t.• '.8- <br />