My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCKILOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : L And Assc. <br />Task # : tr4 State : Colorado <br />Date : 11/252003 County : La Plata <br />User : BHM Site : Oakndge Energy <br />Permit or other job action : Fina! Rec <br />Task descdption :Task 128 <br />HOURLY EQUIPMENT COST <br />Perm~ob # :080 <br />Abbreviation :none <br />Ftiename :0080-h4 <br />Shift basis : 1 per day <br />¢-LOaaarea:rvH -~ <br />-Dump area :NA <br />Motor grader :CAT 14H <br />-Water truck :Water Tanker 3.500 rat <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maimenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA grader misctruk <br />°k Utilization-machine : 100 66 NA NA 35 35 <br />-Ripper attachmem : NA NA NA NA NA NA <br />Ownership cosffiour : $20.12 $27.85 NA NA $36.44 $11.09 <br />Operating cost/hour : $26.72 $28.70 NA NA $15.45 $5.78 <br />Ripper op, cosUhour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $23.61 $27.99 NA NA $28.18 $23.61 <br />Unit subtotals: $70.45 $84.54 NA NA $80.07 $40.47 <br />Number of units : 2 1 0 0 1 1 <br />Group subtotals : Work : $225.44 Support : $0.00 Maintenance : $120.54 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 3.500 BCY <br />Total work team costlhour : $345.98 <br />Swell loose <br />factor : 1.250 volume : 4,375 LCY <br />Source of quantity take-off :ACRD <br />Source of estimated swell factor : ACAD <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity <br />Total cost : $0 <br />Truck Payload (weigh) Basis : Tmck Bed (volume) Basis <br />Material weight: 2,550 poundslLCY Stack volume: 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 15.96 LCY <br />Loading Tool Caoackv <br />Rated capacity (nom. heaped) : 5.750 LCY <br />Descr.: Loose material - 1A?° to 3/8" (90 - 95% ) <br />Run4n} fill rnMnr • n 09F <br />Adjusted bucket capacity : 5.318 LCY <br />Job Cond'dion Corrections : SRe altitude (ft.) : 7,000 <br /> Truck Loader Source <br />Altitude adj.: 1.000 1.000 (Cat HB) <br />Job efficiency : 0.830 0.830 (user) <br />Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.