Laserfiche WebLink
<br /> <br /> <br />~ ~ RECEIVED <br />oc I z 3 )say <br />MINED LAND FEGLANIATIUN <br />Ce!o. Dept. of R'3tur2! P.esources <br />Mr. Jay Lucas <br />October 22, 1981 <br />Page 2 <br />Water <br />1. <br />1. <br />3. <br />4. <br />5. <br />No <br />EXHIBIT E <br />Maximum anticipated slope gradient is 3:1. <br />The depth of topsoil will be dependent upon what is available on site. <br />Noted <br />Tentatively, grazing will be prevented by the installation of electric fences, <br />Noted <br />~ ~~i. ` It is anticipated that the azeas disturbed will not be lazge enougL. to wazrant <br />a reclamation effort every yeaz. However, it is felt that aft~~r 18 to 24 <br />months, enough land will have been disturbed to make it worthwhile to <br />engage in reclamation procedures. <br />EXHIBIT G <br />1. Because of the late date of closing (October 10th) and the time it takes to <br />process the papers, the Deed of Trust has not been obtained. E~ copy of it <br />will be forwazded to you as soon as we receive it. <br />The Vazra Companies, Inc. have been contacted regazdiag the $350 application fee <br />and the $25,000 corporate surety bond. These will also be forwarded to MLIL as soon as <br />they are obtained. <br />