Laserfiche WebLink
<br />i • <br />Nr. Jamae R. !Liner <br />June 12, 1981 <br />Page Two <br />an industrial use. A proposed future land use of wildlife habitat will <br />not in any vay prevent you from using this site as an industrial site <br />at a later data. <br />2. At the Nay Board meeting yoiu presented information on the ongoing recla- <br />mation occurring at this operation. Please submit a written synopsis of <br />the reclamation (method, aateat) that has been done at this site. <br />3. Please clarify what you understand the "spoil from mining", as referred <br />to by the Soil Conservation Service, to consist of. <br />4. Ie there any problem, either economical or physical, in following the <br />Soil Conservation Service's recomendat-ion that spoil from 3lning be <br />place8 against G. W. lagoon dikest Does this fit into reclamation that <br />has been done in the past? <br />5. Rather than the Soil Conservation Service's suggested seed min of ~~ lbs. <br />per acre of tall wheatgrass the staff recommends the following seed miz: <br />Tall wheatgrasa @ 17 lbs./acre; <br />Switchgrasa @ 4 lbs./acre; and <br />Alkali Sscatone @ 1 lb. /acre. <br />The nbo a application rates are for broadcnat seeding, if drilled, the rates <br />should be halved. Tha above seed mix should increase the probability of <br />establishing a diverse, effective, and long-lasting vegetative cover that <br />is capable of self-regeneration. <br />6. To.dhat depth will topeoil~spoil be redistributed over the disturbed lands? <br />7. Do you plan on needing hhe lake bankaY <br />Local Government Approval <br />Hopefully there will be no problem in obtaining county approval. Aa the Horgan <br />County Board of County Commiaeionere meeting is en the same day, June 24, as <br />the first day of the Mined Land Reclamation Board meeting, I will recommend <br />that the Board not take action on this application until June 25, at which time <br />the County's decision will be know. <br />Reclamation Coats <br />Unless the operator request surety to be less than $2,500.00, and submits facts <br />to support such a request, a surety of $2,500.00 will automatically be net. <br />If you are unable to adequately addrwe the above items, or are unable to satisfy <br />the Notice requirements outlined in Rule 3.2 of our Rules and Regulations, you <br />may request a continuance of the Board's consideration of gout application. <br />I apologize for the delay in sending your Complete Letter. If you have any <br />queationa/comments, do not hesitate to contact mn. <br />Sincerely, <br />Jay Lucas <br />Reclamation Specialist <br />JL/gym <br />s <br />