Laserfiche WebLink
'~~ j III III III III IIII III <br />• <br />866 <br />Jme 12. 1981 <br />Ph. James S. Miser, President <br />Buildere Aggregate Co., Inc. <br />915 N. Beaver A . <br />Ft. Morgan, Colorado 80701 <br />RE: Adequacy review of permit application <br />Buildere Aggregate Co., Inc. <br />Buildere Aggregate Pit <br />File: 081-112 <br />Dear Mr. Miner: <br />I have reviewed the above cited application for adequacy and have found that <br />a few items ¢eed clarification. Please address the following items in detail <br />as eoon ae possible. This is without Comments from the State Bngineeze' <br />office which will be forwarded to you upon their receitp. <br />2iining Plan <br />1. Where is the topsoil stockpile located? <br />2. Approximately how many inches of topsoil cover the areas that will be <br />mined in the future? <br />3. Which direction, if any, ie extraction proceeding? <br />4. What is the azpncted life-span of this operation? <br />5. Approximately how much material is extracted per year? <br />6. Are the flume pipe and former pit contained in the proposed affected land <br />acreage? <br />T. What are the dimensions of the former pit? Is this pit periodically cleaned <br />of sediment? <br />1. Plnsae submit a sketch showing all roads, sotekpile areas. acrenn loca- <br />tion, and the flume and former pit. <br />Reclamation Plan <br />1. Your reclamation plan and the proposed future land use of an industrial <br />site era not complementary, i.e.. an elongated lake is not an industrial <br />uea. I suggest that either the proposed future land we be changed eo <br />wildlife habitat, or that the reclamation plan be changed to provide for <br />