My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51446
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE PON 010
Section_Exhibit Name
TAB 13 ATTACHMENT 13-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
during passage of the 10, 25, and 1D0-year storm events. <br />• details Eor the principal and emergency spillway. <br />TABLE 13-3-5 <br />Emergency Spillway Data Summary <br />Sediment Pond 010 <br />Principal Spillway: <br />Type <br />Inlet Elevation <br />Lenq[h <br />Diameter <br />i <br />J <br />Slope <br />10-Yr, 29-Ht Peak Stage <br />Emergency Sp111vay: <br />Type <br />Channel Protection <br />Bottom Wld[h <br />Minimum Oepih (w/freeboard) <br />Length <br />Side Slopes <br />Inlet Elevation <br />100-year, 24-hour Peak Stage (estimate) <br />Table 13-3-5 pcesenta the <br />Riser Inlet (CMPI with <br />6" orifice <br />6785.1 <br />140 feet <br />36" riser with a 24" <br />barrel (6" orifice) <br />9 <br />67BB.d5 <br />Trapezoidal Channel <br />Rock riprap <br />12 feet <br />2 feet <br />60 feet (embankment) <br />3:1 <br />6788.5 <br />6790.6 <br />Summary <br />The capacity of Sedimentation Pond 010 is attributed partially to [he embankment and <br />partially to the pond excavation. During passage of [he 10-year, 24-hour storm the <br />spillway does no[ discharge sediment downstream nor Ss there any floe through the <br />emergency spillway. In addition, the splllxay is designed to safely discharge the 25 and <br />100-year, 24-hour storm event. <br />The embankment will be constructed to be stable and provide adequate freeboard. <br />Therefore, based on the design, this structure complies with the appropriate regulations <br />for a sedimentation structure. Seneca Coal Company will periodically inspect the <br />structure for sediment storage, structural integrity, and hazardous conditions. <br />Maintenance and remedial work viii be performed Sn accordance with the approved mine <br />permit. <br />13-3-9 Revised 09/08/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.