My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51441
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
CDoPH&E Construction Permit No. 05R00020 Initial Approval
Section_Exhibit Name
Tab 22 Attachment 22-1C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hayden Gulch Terminal, Inc. <br />Permit No. 05RO0020 <br />Initial Approval Colorado Department of Public Health and Environment <br />• page 3 Air Pollution Control Division <br />For any non-criteria reportable pollutant: <br />If the emissions increase by 50% or five (5) tons per year, whichever is less, above the <br />level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />~; equipment replaces an existing type of control equipment; or <br />~:` <br />d. Whenever a permit limitation must be modified; or <br />=,_ _. <br />e. No later than 30 days before the existing APEN expires. <br />I,... <br />11. Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />~_' " responsibility to self certify compliance with the conditions. Failure to demonstrate compliance <br />within 180 days may result in revocation of the permit. (Information on how to certify compliance <br />i was mailed with the permit.) <br />~~ A.~ ~. <br />t R K ancock III, P.E. Roland C. ea, .E. <br />? Construction Permits Unit Supervisor Permitting Supervisor <br />Notes to Permit Holder: <br />1) The production or raw material processing limits and emission limits contained in this permit are <br />' based on the production/processing rates requested in the permit application. These limits may <br />" be revised upon request of the permittee providing there is no exceedence of any specific <br />1"' emission control regulation or any ambient air quality standard. A revised air pollution emission <br />; notice (APEN) and application form must be submitted with a request for a permit revision. <br />'" 2) <br />4 This source is subject to the Common Provisions Regulation Part II, Subpart E, Upset Conditions <br /> and Breakdowns. The permittee shall notify the Division of any upset condition which causes a <br />j' violation of any emission limit or limits stated in this permit as soon as possible, but no later than <br /> two (2) hours after the start of the next working day, followed by written notice to the Division <br /> explaining the cause of the occurrence and that proper action has been or is being taken to <br /> correct the conditions causing said violation and to prevent such excess emission in the future. <br />3) In accordance with C.R.S. 25-7-114.1, the Air Pollutant Emission Notice (APEN) associated with <br />~.~ this permit is valid for a term of five years. The five year term for the APEN received with this <br />~ " permit application expires on April 4, 2010. A revised APEN shall be submitted no later than 30 <br /> <br />- <br />;. <br />days before the five year term expires. <br />4) This source is classified as a: Minor Source <br />" At a: Minor Facility <br />ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.