My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc <br />• <br />r~ <br />LJ <br />Ames did not conduct any construction activities in the Phase Nc area during this reporting period. <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />azeas was observed. Golder observed Structural Fill (SF) placement in Phase IV for lift thickness, <br />moisture content, and compactive effort. <br />Golder observed and tested placement of SLF in Phase Na, completing five in-situ density tests, <br />seven depth verification tests, and verified surface prepazation. Prior to geomembrane deployment, <br />the SLF met the requirements of the specifications. <br />Golder observed anchor trench excavation and backfill for proper location, materials, lift thickness, <br />compaction, and dimension (2' wide and 3' deep). Anchor trench excavation and backfill met or <br />exceeded the requirements of the specifications. <br />Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase IVa area met the project specifications. <br />Golder observed and documented excavation and remediation activities associated with the Phase IV <br />underground working construction. <br />Golder observed placement of SF, SSF, and CP for underground working remediaion. These materials <br />were placed in accordance with the drawings and specifications into excavated or open underground <br />workings. Golder previously obtained samples of SF, SSF, and CP for laboratory testing. Materials <br />supplied met specifications. Terracon conducted field testing and sampling of CP concrete as per <br />specifications, and will supply 28-day strength results. <br />Golder observed and documented confirmation drilling activities associated with the Phase IV <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />including logging holes, mazking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Golder visually observed the placement of DCF in the Phase IVa azea. Golder had one CQA monitor <br />per dozer to observe DCF placement. <br />Laboratory Tests <br />Golder obtained one sample of Soil Liner Fill (SLFa-12), one sample of Drain Cover Fill (DCFa- <br />03), and one sample of Structural Fill (SFb-11) for laboratory testing. The samples tested met the <br />requirements of the specifications and results are presented in Attachment B. <br />PhaaelVa59 July 18-Auguat l0 doc Golder Associates lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.