Laserfiche WebLink
~ -- _ ,A-~G~~~oAAld,e~r+ <br />1f,7)ll~CllCs <br />s <br />August 13, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 59: July 28 through August 10, 2002 <br />Cresson Project Phase IVa, b, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of July 28d' <br />through August l Od', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 43° F to 59° F, and highs ranged from 75° F to 93° F. Rain was recorded <br />on July 30d', August 2nd ,and August 6d' through August 8`~, 2002. Weather observations were made <br />on eleven days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Na, b, <br />and c construction. Ames conducted Phase Na, b, and c construction activities on eleven days of this <br />fourteen-day reporting period (July 29d' through August 2"d and August 5~' through August 10 ). <br />Phase Na <br />Ames continued to haul, place, and conduct final surface prepaza5ons on Soil Liner Fill (SLF) in Phase <br />Na south of the previously deployed geomembrane. Ames continued to conduct Depth Verification <br />Testing, completing tests fifty-nine through sixty-six. Ames continued excavation and backfill of the <br />anchor trench along the eastern and southern limit of Phase Na in prepazation for geomembrane <br />deployment. <br />