ase Va Weekiy Summary No. 57 Page 3 <br />Phase Nc <br />Ames did not conduct any construction activities in the Phase Nc azea during this reporting period. <br />Field Monitoring and Testine Activities <br />Golder observed construction activities associated with Phase N earthworks. All construction <br />materials and sail materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />azeas was observed. Golder observed Structural Fill (SF) placement in Phase IV for lift thickness, <br />moisture content, and compactive effort. <br />Golder provided observation of DCF removal from the edge of the Phase III and LOB geomembrane <br />for defects outside of the tie-in. Defects outside of the tie-in were mazked for repair. <br />Golder observed and tested placement of SLF in Phase IVa, completing twenty-two in-situ density <br />tests, six depth verification tests, and verified surface prepazation. Prior to geomembrane <br />deployment, the SLF met the requirements of the specifications. <br />Golder observed anchor trench excavation for proper location and dimension (2' wide and 3' deep). <br />Anchor trench excavation met or exceeded the requirements of the specifications. <br />Golder observed concrete placement for construction of the 42-inch CSP headwall. The concrete was <br />placed in accordance with the drawings and specifications. <br />Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase Na azea met the project specifications. <br />I • <br />Golder observed construction of the Primary Underdrain and Secondary Underdrains in Phase IVb <br />for trench dimensions (5' by 3' and 4' by 2'), slope (minimum 1%), materials, and geomembrane <br />overlap. <br />Golder observed and documented excavation and remediation activities associated with the Phase IV <br />underground working construction. Full-time monitoring was given to excavation of underground <br />workings. <br />Golder observed and documented confirmation drilling activities associated with the Phase N <br />construction. Full-time monitoring was given to confirmation drilling of underground workings <br />including logging holes, mazking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Phme Rh Sl luneJ0.JUly 13.doc Golder Associates Inc. <br />