My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - Assoc~iTtes <br />i <br />I~ <br />July 16, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 57: June 30 through July 13, 2002 <br />Cresson Project Phase IVa, b, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVa, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of June 30d' <br />through July 13d', 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ran~ed from 47° F to 54° F, and highs ranged from 68° F to 80° F. Rain was recorded <br />on July 15t 2"d, 9 ,and l Od', 2002. Weather observations were made on twelve days of this fourteen- <br />day reporting period. <br />Construction Svnonsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVa, b, <br />and c construction. Ames conducted Phase Na, b, and c construction activities on twelve days of this <br />fourteen-day reporting period (June 30d' through July 3rd and July 6d' through July 13d'). <br />Phase IVa <br />Ames resumed placement of Structural Fill (SF) and slope recontouring in the southwest corner of <br />Phase P/a by conducting final subgrade prepazation prior to Soil Liner Fill placement. <br />Ames continued to haul, place, and conduct final surface prepazations on Soil Liner Fill (SLF) in Phase <br />IVa south of the previously deployed geomembrane. Ames continued to haul and place SLF below the <br />9575 road at the southern end of the Phase IVa area, completing hauling and placement of SLF in the <br />Phase IVa area on July l ld'. Ames continued to conduct Depth Verification Testing, completing test <br />Golder Associates Inc. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />
The URL can be used to link to this page
Your browser does not support the video tag.