My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51426
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000050
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT A LEGAL DESCRIPTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(1) Measure to minimize disturbance to the hydrologic balance, prevent off-site drainage and <br />provide for a stable configuration of the reclaimed area consistent with the proposed future <br />use of the land. <br />This is a unique operation taking place in the stem of the Arikaree. The stream flow will replenish <br />the previously mined material whenever it flows. This operation will not affect the hydrologic <br />balance of the area. Reclamation will consist solely of seeding the reclaimed backslopes at the <br />stream edge to rangeland use, which is consistent with future use and that of the surrounding land <br />of the owner/applicant. An Army Corps of Engineers 404 Permit is being secured which will <br />provide the measures necessary to protect the hydrology and land use of the area. <br />(m) Specify whether the deposit/ore will be processed on site. <br />There will be no on-site processing as the material will be loaded into haul trucks to be moved to a <br />processing site off of the property. <br />(n) Identify the primary and secondary commodities to be mined/extracted and describe the <br />intended use. <br />The only material to be mined is the sand and gravel on the floor of the Arikazee River and Currie <br />Creek. There is no other material available as a secondary product. the material will be used for <br />construction aggregates on projects in the azea. <br />(o) Name and describe the intended use of all expected incidental products to be <br />mined/extracted by the proposed operation. <br />As stated in "n" above, there aze no incidental or secondary commodities to be mined from this site. <br />Sand and gravel are the only products that are present and will be used as various construction <br />aggregates. <br />C-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.