Laserfiche WebLink
Gold HrIl M>D ~ Adequacy Raaew Responses • May 31, 1993 <br />Water can also be pumped fivm the Hegel A edit through a 2 irrh pipeline that paallels the decant line <br />on the smfaa most of the way to the Heal A edit A cerrmfugel pump is located ou~ide the bulldread <br />W the Hazel A edit <br />'Ihe wets lines coming from the 15me mine tb the mill end from the Hazd A ad@ to the mr71 w~ be <br />checked one per week whrn opereting with no chc~ whrn idle. <br />14. Emberdunem construction speciflcatiauts ere Winched. <br />13. 7tre Bureau of Mines monitor wells ~ be phrgged prior ib reclamation, however, the &meau of Mines <br />will be contacted prior to ph~~g to detemrvre whether the Bmeau of mines and/or the Division of <br />Water Resources has continued use for the wells. Abendonrnem costa wr71 be inchrdedm the bond. <br />16. A locking mewl gate ~ be inateIled on the Hazel A adds. 77re 7 one mice cunmtly has a locking <br />metal gate in place. 7be cost to install the gate will be inch~ded m the reclamation cost estimate. Both <br />the Heu1 A end Tune mine edits ere epprordmWely 6-feet high and S feet wide. <br />17 the cost of placement of rock cove, closing the Hazel A end Tnpe mine add, sealing wells, geolodile <br />purchase, end mobt7i~tion end demobr7ization of equipment have been inchrded in the reclamation <br />cost estimate. <br />