My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51384
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:29 PM
Creation date
11/20/2007 2:52:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Permit File
Doc Date
6/2/1995
Doc Name
PERMIT APPLICATION ADEQUACY REVIEW RESPONSES GOLD HILL MILL
From
COM INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~ <br /> <br />(fold Hill Mill Adequacy Review Responses May 31, 1995 <br />8. All chemicals will be stored within the mill building so that apU4 can be oontairiod. No moue than 12 <br />empty ehemicel deans will be stored on site at any evert time. <br />9. A phut vizw aCUtz uu'0 bwldutg is itu:lttded fo show ett possible exit poittta far !laid err shtay apa'fla. Afl <br />wash down water from the upper levels currently flows down fo the knver laud whoa the tlticlosier is <br />located There are three exit poirtts on the borer laud that wiG have to be modified m aanhin a <br />'reasonably foreseeable sprIl^. A rolhrp overhead door am the rtaathast side of the lower laud wig <br />leave to have the foundation continued across the bottom ofthe door. On the eestaidS atnan doaJ.wr'D <br />Lave to have the foundation oordntxd across the etttrarice std the door Game moved up to the top of <br />the foundation wa1L Steps wrb Lave to be provided ir~de and outside of the butldutg to provide nfe <br />access through the door. An access belch on the seat aide of the buflding tluocrgh the Gendalion waQ <br />into a sump cutout for the thirJrater will have to be sealed. <br />The top of the foundation wafl Gom the firtished floor slab m the lower levdx Ill iriolua. Toles interior <br />floor area of the lower laud is 67.8 feet by 47.5 beet Total storage capecrty witLm the ibundation walls <br />is 35,900 gallon,. We do riot believe that a complete tank ngrhue of the Ihicloerxl (75,111111 gallon <br />capaaty) would be the mast'Yeaaonably foreseeabk spill.. event The swat tikdy everda world be a <br />phtgged line causing en overflow or a broken line that might spi'fl a portion of the tank vohtme befaue <br />repeus could be made. During a spiIl, the floor drauta would dtaut pert of a e~ to the tar3rtgi pond. <br />We believe tbet with Utz modificetiate to the fourulefion walls at the doss, adequate aspacdy is <br />available for a spill situation <br />10. The dn~ersion ditches above the present teilutgs pond are shown on Exhibit E-1 that is attached. The <br />ditch reaches and size, ere displayed on a teblz on the map. The cuaent ditches are large enough to <br />carry the peak flow during a 100-year, 2d-hour desist stomr. <br />The drainage ems above the expanded tares' tgs pond that wDl dttt6t into the tatlhtgs pond is loo smaIl to <br />justify ally diversion ditcttzs Cor tuutisturbed dreirtage. All disturbed area dreituge wifl flow into the <br />mdrrtgs pond. The sable shown in Item 23 of otu previous respome rhadd be becawe the <br />ditches described are no longer being proposed <br />11. A low pyritic "graded rock cover" will be excavated from the txtaow area end stockpiled above the <br />borrow area for used during reclarnetion. The borrow gttant8y wtIl be suHiamt b cover the tailntgs <br />area with 24 inches of material. The bond wiIl re&d the 6t11 cost of excavation . hattting, damping and <br />spreading the rock coves. It is our undersmndirtg flat the bond wtIl be seduced by the excavation coat <br />witzn the graded rock stackptle is in place. <br />The cast of geotexttk wrlf be added to the baud. <br />12. The watu laud behud the Hazel A btrlldtead ~ be checked and recorded dally when the Gee water <br />surface m the pond is high enough to overtop tlrc decant slatdpipes. TLe fiuy of the decant <br />risers will be petfomted monthly and recorded. <br />The mmuloring observations for ell itans listed in Itzm 26 of our previous adequacy review resparuea <br />u well as the frequency listed above and in item 13 blow wig be kept in a log a< the still office that a <br />available to the Division upon tegtrest. <br />13. '[I>z i.urulruction dzscyiplion lettzr by Mr. Mark Steen, dated July 16,1987, is attached. <br />The previous adequacy response sorted that water for the mill was pumped Gom the Wynauu mine <br />shag. Oru date for the response was inecttuate. After a site survry, we have detemtated that water for <br />Wz will is ptunpzd from a lwrzholz located west std across the roars from the Trull buiWirtg. The <br />borehole extends into the'1'ime mine and is pumped to the mill by a submaebk: pump kxxited yr the <br />borehole. The water is pumped through a 2-etch line that is Mated moat of the way m the mill <br />
The URL can be used to link to this page
Your browser does not support the video tag.